Sydney Metro City & Southwest
Sydney, NSW
JHCPBG (John Holland CPB Ghella)
Detailed Rock Sawing & Excavation works
June 2017 – Mid 2021
$2.81b
Contract work in detailed excavation of sawing wall & boundaries at 22 metres deep. The work was contracted out to the diversion of a 1.5m covert. All other stone water and sewer lines were installed by Cono Servcices
Contract work carried out consisting of Hammering, Saw cutting & bulk excavations, 12m below ground level.
All aspects of civil works carried out from pad building for piling rigs, trenching for storm & electrical piping, landscaping and final trimming for roads.
Detailed rock cutting and hammering carried out on the ventilation shaft of the NEW M5, Sydney.
Excavating the lift access shaft using a combination of controlled blasting, saw cutting, drilling, and rock hammering
Project included: All sizes storm water drainage, storm water culverts, manholes and pits, detention basin. Formwork - constructing in situ pits.